FGP is the third processing plant in operation at the Tengiz oil field, which expands sour gas injection capability and is expected to ramp up output to one million barrels of oil equivalent per day.
The agreement includes the supply of a 30-foot cabin containing two high-efficiency hydraulic compressors with three combined compression stages, enabling a pressure of up to 450 bar.
Petrobras extends the FPSO Cidade de Angra dos Reis charter to 2030, enabling upgrades to enhance efficiency, safety, reliability, and reduce greenhouse gas emissions.
Working closely together, SLB and Star Energy Geothermal aim to deploy technologies that shift the economics of conventional geothermal projects and improve recovery rates of geothermal assets.
With precise control, ASCO electric dump valves actuate in 50 to 75 milliseconds compared to conventional valves that take several seconds, thus virtually eliminating any chance of gas blowby.
This latest win follows a recently awarded five-year contract renewal to continue delivering brownfield engineering, procurement and construction (EPC) solutions across the same Gippsland Basin assets.
Flowserve will supply Dry Gas Seals for Celeros' high-pressure injection packages, pioneering the first continuous supercritical CO₂ pump injection services for enhanced oil recovery.