The development consists of six gas discoveries and flexibility for three prospects in addition, utilizing existing infrastructure and processing capacity at Åsgard B.
The Pertamina East Natuna working area spans 10,484 km², with sea depths of 130-150 meters, and is approximately 270 kilometers from Natuna Besar Island.
Pulau Indah power plant, powered by GE Vernova 9HA.01 combined cycle equipment, will benefit from GE Vernova’s maintenance services for the next 21 years.
ExxonMobil continues to drive innovation in seismic imaging with the introduction of Discovery 6, a high-performance computing system built in collaboration with HPE and NVIDIA.
The INNOMAG TB-MAG Dual Drive Pump is the world's only magnetic drive pump that is double hermetically sealed and features a secondary independent containment system to reduce impact from failures.
Utilizing Baker Hughes’ industry-leading rotating equipment and their maintenance services is critical to ensuring the Rio Grande LNG Facility operates efficiently and reliably.