Join the 155,000+ IMP followers

www.oilgastechnology.com

Baker Hughes Secures Thirteen Year Service Contract With Nigeria LNG

The long-term agreement provides comprehensive lifecycle services and digital monitoring for turbomachinery equipment to support the facility's Train 7 capacity expansion project.

  www.bakerhughes.com
Baker Hughes Secures Thirteen Year Service Contract With Nigeria LNG

Nigeria LNG Limited (NLNG) and Baker Hughes have entered into a 13-year lifecycle service agreement to support the operational performance of the new Train 7 expansion project at the Bonny Island liquefaction plant in Nigeria. This collaboration aims to manage the technical availability and reliability of critical turbomachinery as the facility increases its total liquefied natural gas (LNG) production capacity from 22 to 30 million tonnes per annum (MTPA).

The complexity of scaling up production requires continuous asset optimization. This framework relies on combining the plant operational infrastructure of NLNG with the specialized engineering and remote diagnostic capabilities of Baker Hughes.

Technical Solution and System Architecture
The technical scope of the agreement covers comprehensive lifecycle services for specific turbomachinery equipment deployed during the 2021 phase of the project. This asset inventory includes four heavy-duty gas turbines, the associated centrifugal compressors, and two additional gas turbines dedicated to facility power generation.

To maintain process stability, the integration utilizes digital infrastructure for remote monitoring and diagnostics. The system functions through the Baker Hughes iCenter digital services platform, which is powered by Cordant software. This architecture allows for the continuous collection and analysis of thermodynamic and mechanical parameters from the turbines and compressors. By processing real-time telemetry, the diagnostic system identifies performance deviations, predicts component wear, and schedules preventative maintenance cycles to mitigate unplanned downtime.

Deployment, Maintenance, and Regional Integration
The deployment combines remote digital monitoring with localized engineering support. Operational execution and physical servicing under the contract are managed through the Baker Hughes Service Center located in Port Harcourt, Nigeria. This localized engineering setup ensures that qualified technical personnel are available for rapid on-site intervention, mechanical overhauls, and parts replacement, minimizing the mean time to repair (MTTR).

The integration of these lifecycle services directly supports the existing plant infrastructure while accommodating the higher load profiles introduced by the Train 7 expansion. By linking the local service facility with centralized digital diagnostics, the partnership provides a closed-loop maintenance system.

Operational Applications and Expected Impact
The primary application area for this solution is the industrial gas processing sector, specifically large-scale LNG liquefaction. The concrete technical use case involves the continuous health monitoring of baseline power generation and high-pressure compression trains required for gas liquefaction.

The expected impact of this technical cooperation centers on quantifiable operational efficiency and reliability. Maintaining the mechanical integrity of the centrifugal compressors and gas turbines ensures steady-state throughput matching the planned 30 MTPA capacity. Furthermore, the use of predictive diagnostics rather than reactive maintenance reduces overall lifecycle costs and helps stabilize the energy supply required to meet global delivery commitments.

Edited by Evgeny Churilov, Induportals Media - Adapted by AI.

www.bakerhughes.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers

International