Baker Hughes secured a multi-year deal with Aramco to increase its integrated underbalanced coiled tubing drilling fleet from four to ten units across Saudi Arabia's gas fields.
Petrobras signed the Expenses and Volumes Equalization Agreement (AEGV) with PPSA for the Jubarte Pre-Salt Shared Reservoir, agreeing to pay R$ 1.54 billion to reconcile costs and revenues.
The FlowHeat system enables post-lay heating of subsea flowlines up to 30km at 3000m depth, cutting installation costs by 35% and carbon emissions by 30%.
The Volans-1X exploration well discovered a high-quality, 26m rich gas condensate reservoir with excellent properties, a high condensate-to-gas ratio (>140 bbl/mmscf), and a 40 degrees API gravity liquid.
AI-powered innovation, smart infrastructure, and decarbonisation take centre stage as industry leaders unite in Amsterdam to shape a data-driven, sustainable energy future.
Halliburton and Aker BP successfully deployed the eROCS and OTHOS systems to complete the first umbilical-less tubing hanger installation, reducing complexity, costs, and risk in subsea operations.
Active in biomethane since 2009, SAFE supports operators, utilities and developers with a comprehensive, modular offering that covers the entire value chain.
McDermott successfully completed the Begonia subsea field development for TotalEnergies in Angola by installing 40 kilometers of rigid pipelines, which will add 30,000 barrels of oil per day to the Pazflor FPSO.
Bacalhau is the largest of Equinor's international field, with 1+ billion barrels in reserves and a capacity of 220,000 barrels per day, using a lower-carbon FPSO in ultra-deep water Brazil.
Halliburton won multiple Petrobras deepwater contracts for vessel stimulation, intelligent completions (SmartWell for Búzios), and EcoStar safety valves for the Séepia and Atapu fields in Brazil, starting in 2026.