Sanctioned in June 2019, this second development phase “Mero-2” includes the Sepetiba FPSO with a production capacity of 180,000 barrels of oil per day (b/d).
The MoU covers the scope of potential evacuation of production from Block SK405B through D35/D21/J4 Production Sharing Contract (PSC) facilities, Post 1976 Balingian PSC facilities and Bintulu Crude Oil Terminal operated by PETRONAS Carigali.
The new unit will be installed at the Group’s hydrogen production plant located in the port of Rotterdam and will be connected to Porthos, one of Europe’s largest carbon capture and storage infrastructure.
HES Optimizer is a digital tool that combines internal process calculations with measurements available at site to enable energy savings in the operation of Venturi-type scrubbers in wet gas cleaning plants.