Join the 155,000+ IMP followers

www.oilgastechnology.com
TotalEnergies News

TOTALENERGIES ANNOUNCES START OF PRODUCTION FROM SECOND DEVELOPMENT PHASE OF MERO FIELD

Sanctioned in June 2019, this second development phase “Mero-2” includes the Sepetiba FPSO with a production capacity of 180,000 barrels of oil per day (b/d).

TOTALENERGIES ANNOUNCES START OF PRODUCTION FROM SECOND DEVELOPMENT PHASE OF MERO FIELD

TotalEnergies announced the start of production from the second development phase of the Mero field on the Libra block located more than 180 kilometres off the coast of Rio de Janeiro, Brazil, in the pre-salt area of the Santos Basin.

Sanctioned in June 2019, this second development phase “Mero-2” includes the Sepetiba FPSO (Floating Production, Storage and Offloading unit) with a production capacity of 180,000 barrels of oil per day (b/d). The FPSO has been designed for zero routine flaring to minimize greenhouse gas emissions, with the associated gas reinjected into the reservoir.

Thanks to Mero-2, the Mero field will reach a production capacity of 410,000 b/d. Two additional development phases of 180,000 b/d each, Mero-3 and Mero-4, are currently under construction, with start-ups expected by 2025. At full capacity, production from the Mero field is expected to amount to more than 100,000 b/d in TotalEnergies share.

"The production start-up of Mero-2 is a new milestone for TotalEnergies in Brazil, a key growth area for the Company. With its vast resources and world-class productivity, the Mero development delivers low-cost and low-emission oil production, in line with the strategy of our Company," said Patrick Pouyanné, Chairman and CEO of TotalEnergies.

www.totalenergies.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers

International